CBE 8.96% 7.3¢ cobre limited

Here's an extract from the Ngami Project graphic on the CBE site...

  1. 580 Posts.
    lightbulb Created with Sketch. 686
    Here's an extract from the Ngami Project graphic on the CBE site (https://www.cobre.com.au/okavango-and-ngami-projects/). It shows a "priority contact target" (dashed red line) based on earlier work, which scales at about 11km, I've superimposed the outline of the CBE figure I posted earlier ( https://hotcopper.com.au/posts/63141761/single) with the planned "infill drilling". We could well be sitting on significantly more mineralised strike than 4-5km especially to the NW.

    https://hotcopper.com.au/data/attachments/4598/4598785-74e87c7a66472bca2f101ba2dc4eb124.jpg

    Something else which I like is the high copper grades of the KCB deposits (relative to the grades of typical large Cu porphyry deposits I'm more familiar with). Martin Holland mentions the neighbouring Zone 5 deposit, with about 4km of strike, has about 92Mt at 2.2%, about 2Mt of contained copper, which at current prices implies an in-ground value of about US$16Bn, and using a 2.5-5% rule of thumb would justify a Market Cap of US$400-800M.

    He mentions he is looking forward to drilling a lateral drill hole which will show the depth and width of the deposit. So am I, as once we get that data it will allow ball-parking of the potential size/volume. Seems to me there is plenty here to justify a rerate, and with some luck an ongoing rerate, and that's not even thinking about the other 500km of strike, the 57 additional targets or the potential district.

 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
0.006(8.96%)
Mkt cap ! $24.17M
Open High Low Value Volume
7.0¢ 7.3¢ 6.9¢ $14.61K 208.9K

Buyers (Bids)

No. Vol. Price($)
1 100000 6.7¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 48426 1
View Market Depth
Last trade - 13.35pm 28/06/2024 (20 minute delay) ?
CBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.