LB I didn’t say nothing was happening but until those engineers come up with a design complete the drawings including footings for concrete slabs so the guys can put in a redevelopment application with the local council because they will want to know what’s going on, nothing much will happen on the ground, and certainly not before it’s all priced.
They need to check out power requirements for each new piece of equipment and seeing if Country Energy can supply the increase in power through its lines without an upgrade. Line upgrades are expensive and it’s user pays as are new transformers which will be needed to double through put. Then you need an electricians quote for rewiring and a bigger or new motor control centre.
There is a lot going on without it even looking like it!
Im sure PM will announce it all here when he has the final plans because it’s a big deal and SH will need to approve the share issue.
- Forums
- ASX - By Stock
- Ann: Adelong Plant Upgrade Underway
LB I didn’t say nothing was happening but until those engineers...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.589M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $3.524K | 704.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
26 | 12558793 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 4865535 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
26 | 12558793 | 0.004 |
38 | 16449247 | 0.003 |
13 | 89360000 | 0.002 |
11 | 69055001 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 4865535 | 4 |
0.006 | 5461004 | 7 |
0.007 | 9197935 | 6 |
0.008 | 5833333 | 5 |
0.009 | 5194444 | 4 |
Last trade - 12.04pm 01/11/2024 (20 minute delay) ? |
Featured News
ADG (ASX) Chart |