http://www.*****net.com/charts/metals/base/t24_zc450x275.gif
2C Will be and very soon IMV, target 200Mt at 5-7%Zn that means POSSIBLE 10 Million tonne Zinc in place, I am thinking Rio Tinto should buy back AB zinc project at $50m now before it's too late.
- Forums
- ASX - By Stock
- Ann: Admiral Bay Zinc Project Acquisition Update
[IMG] 2C Will be and very soon IMV, target 200Mt at 5-7%Zn that...
-
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)