ADT 2.38% $3.69 adriatic metals plc

One of the largest input cost for mine is energy. Grinding ore...

  1. 613 Posts.
    lightbulb Created with Sketch. 421
    One of the largest input cost for mine is energy. Grinding ore is energy intensive. The smaller you grind, the more energy intensive. Look at the Bibiani feasibility study you reference. Power is half of all processing ($10/$20 per tonne). Recovering another 40% of the gold would only contribute another 5% or so of revenue whereas the re-grinding and leaching would contribute over 10% to operating costs. Too, most of the higher grade gold is found at depth and later in mine life, anyway. So why pay up front capital to maximize gold recovery when capex for gold recovery only pays for itself later in mine life? Doesn't make much sense to me.
 
watchlist Created with Sketch. Add ADT (ASX) to my watchlist
(20min delay)
Last
$3.69
Change
-0.090(2.38%)
Mkt cap ! $1.035B
Open High Low Value Volume
$3.75 $3.76 $3.66 $1.937M 523.7K

Buyers (Bids)

No. Vol. Price($)
29 14736 $3.68
 

Sellers (Offers)

Price($) Vol. No.
$3.69 13882 9
View Market Depth
Last trade - 13.49pm 05/07/2024 (20 minute delay) ?
ADT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.