ADT 5.03% $3.59 adriatic metals plc

Ann: Adriatic Metals Exceptional Pre Feasibility Study Vares, page-20

  1. 86 Posts.
    lightbulb Created with Sketch. 48
    Compared to the scoping study, looks like...
    • Tonnage down from 11.9Mt to 11.1Mt
    • Capex about the same (they did lower the contingency)
    • Opex up from $91.9/t to $120/t
    ... but then the silver and gold price assumptions increased so IRR is about the same!

    So I would say overall a step back from the Scoping Study, but still quality.

 
watchlist Created with Sketch. Add ADT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.