From the report:
As a result of the expansion in the mineralised footprint visually evident from recent drilling, a deferral of the Pre-Feasibility Study (“PFS” was considered to allow additional drilling to be incorporated into an updated mineral resource estimate, which will be utilised for the PFS. This is not as a result of any delays in PFS work streams, which are all progressing as planned, or any COVID-19 related issues. The PFS is now expected to be complete in September 2020.
Obviously the visuals from these recent holes must be pretty encouraging....can't wait to see the assays.
- Forums
- ASX - By Stock
- Ann: Adriatic Metals Quarterly Activities Report and Cashflow
From the report: As a result of the expansion in the mineralised...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.09 |
Change
0.190(4.87%) |
Mkt cap ! $1.142B |
Open | High | Low | Value | Volume |
$3.98 | $4.12 | $3.97 | $5.648M | 1.389M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 477 | $4.06 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.09 | 910 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 477 | 4.060 |
1 | 477 | 4.050 |
1 | 477 | 4.040 |
1 | 477 | 4.030 |
2 | 977 | 4.020 |
Price($) | Vol. | No. |
---|---|---|
4.090 | 910 | 1 |
4.100 | 16000 | 2 |
4.120 | 477 | 2 |
4.130 | 1215 | 2 |
4.140 | 477 | 1 |
Last trade - 16.10pm 17/10/2024 (20 minute delay) ? |
Featured News
ADT (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online