-
Share
4,194 Posts.
785
22/08/18
16:21
Share
Couple of things that might contribute to the cost difference:
- Cauchari will be producing battery grade eventually so costs include purification processing that is not present in Olaroz Stage 2
- AAL costs will include site infrastructure (roads, power, gas pipeline, brine bores and pipes etc) that have already been built at Olaroz.
-