o Tietto’s fleet of 6 DD rigs achieving low-cost drilling @ ~$35/m
o Drilling more than 10,000m of diamond core at Abujar per month
LOM will be updated. Take time only
Just sit N wait.
Have some patience
10000m/300m depth each hole average = 33 to 35 holes per month
Dec will soon be here. N TIE will see Gold b4 BGL.
BGL Production on track for 2nd half CY2023
Than TIE will be just like a repeat of WAF.
Open pit less challenging than BGL underground.
Althought BGL hv high grade of 6.1g/t underground. ore reserves.
- Forums
- ASX - By Stock
- Ann: Africa Down Under Presentation
o Tietto’s fleet of 6 DD rigs achieving low-cost drilling @...
-
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)