SVG 0.00% 2.9¢ savannah goldfields limited

Ann: Agate Creek Gold Production Update, page-68

  1. 22,809 Posts.
    lightbulb Created with Sketch. 769
    PS: I too speculate (IMO) that the grade will pan out at more than 6.01# G/T come next September and that the processable ore tonnages will be
    greater than than 50K then. But that's all IMO.
    Keep in mind that a grade of 8.01 for gold sold in May gave LNY over 50% of the revenue with Maroon doing all the work with the exception of our
    geo on site & drilling expenses. Drilling for the 1000 meters add seems to be about $50/meter* or $50K for the month.

    All IMO only.

    # YTD mid June grade is 8.3 G/T. We know from anns that there is grades up to 500 G/T for very small tonnages but the main game is overall
    head grade mined and I'm pleased with that

    * can provide a link if required for RC drilling
 
watchlist Created with Sketch. Add SVG (ASX) to my watchlist
(20min delay)
Last
2.9¢
Change
0.000(0.00%)
Mkt cap ! $8.151M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 59320 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 228290 3
View Market Depth
Last trade - 16.12pm 13/09/2024 (20 minute delay) ?
SVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.