Niuminco has "completed 6 holes"
and is "currently drilling the first of up to 10 deeper (300m) holes"
& "Assay results on the first four completed"
Page 11 AGM
Current Drilling Program
Niuminco has completed 6 holes in its shallow (<60m) drilling program at the Enterprise and Karuka vein systems, and is currently drilling the first of up to 10 deeper (300m) holes into the Enterprise/Kaurka diatreme and stock-work zone.
Page 12 AGM
Enterprise Vein Drill Results
Assay results on the first four completed drill holes EDD019, EDD020, EDD021,
EDD022 are as follows:
Each of the holes contained a higher grade vein section conforming to the predicted
west-dipping vein model:
Page 17 AGM
Bolobip Project
Potential for discovery of economic gold/copper
mineralisation is considered significant and
preparation is underway to commence a 3 hole,
900m diamond drill program.
5 october Ann Page 4 - Edie Cr Gold Intercepts
Drilling Program for Tasmanian Tin Assets
The attractively priced $90 per metre “all-up” cost program will be completed over 2–3 months
--------------------------------------------------------------------------------------------------------------------------------------
Upon re-reading these anns,
All new ann's will be about Gold
*Drill results completed (final assay's to come)
*The ten hole program they have started !
*Plus equipment upgrade progress to increase production - eg shipping to on land, transport to site & install etc.
*Along with the start of Bolobip Drill Program as May River has historical results.
As Tin is a two to 3 month commenced program!
FID
- Forums
- ASX - By Stock
- NIU
- Ann: AGM Presentation
Ann: AGM Presentation, page-33
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NIU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online