88E 0.00% 0.2¢ 88 energy limited

Ann: AGM Presentation, page-15

  1. 494 Posts.
    lightbulb Created with Sketch. 157
    Sorry for late reply Doc,

    I did not attend the meeting. I just picked this off the 88 website presentation

    88E Website: Page 6 and page17 re: Texas:
    " *JV assessing new venture opportunities to potentially acquire additional acreage position proximate to Project Longhorn"
    " * Project Longhorn development opportunities: Four work-overs and at least five new drill targets remain on the acreage"

    Project Leonis: Page 13: 88E Activity shows Subject to planned data analysis 2024/25 Potential drill program Q1/2 + Forward work program Page 6

    From page 1 of the 28 February 2023 announcement on 88eWiki Regarding approval of the Unit application
    "Subject to success of the Hickory-1 exploration well, the JV will consider mobilising a rig to the Franklin Bluffs pad and re-entering the Icewine-1 well, with a view to potentially conducting a shortterm production test or drilling and flow testing a new delineation appraisal well in a subsequent season".

    From the Toolkit River Unit Application 6/12/22 Exhibit G page 2
    "The potential re-entry and flow test of the Icewine-1 well will also deliver on the above objectives, subject to work completed during the proposed non-drilling phase in 2023. Any re-entry and flow test of Icewine-1 would occur in 2024 summer season, and be subject to the results of the proposed new 2023 exploration well and flow test".


    From the DNR approval 27th February 2023 (page 7/8)

    "Accumulate will re-enter Hickory-1 and hydraulically fracture and flow test the Kuparuk, basin floor fan, shelf fan system, and shelf margin deltaics play fairways in the winter of 2024. Upon a successful flow test of Hickory 1, Accumulate will determine if Icewine 1 can be re-entered safely, and flow test the well in summer 2024. Contingent on successful flow tests of Hickory 1 and Icewine 1, Accumulate will drill an additional horizontal well with a multi-stage hydraulic fracture completion in 2025."


 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.1¢ 0.2¢ 0.1¢ $44.46K 35.20M

Buyers (Bids)

No. Vol. Price($)
307 1199858941 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 151348045 29
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.