KKO 6.85% 6.8¢ kinetiko energy ltd

Ann: Agreement with IDC to Develop SA Largest Onshore LNG Project, page-20

  1. 1,538 Posts.
    lightbulb Created with Sketch. 175
    IDC was given 60 days to do DD before signing binding contract to unlock 2.1Tcf resource for the 500mw project.
    It sounds confident that 2.1Tcf gas reserves can be proven. We look at $2b MC one day at least when that's proven.
    Timeline for that could well be: it is projected to take next 2-3 years for the 1st stage 50mw project, 10years for the 500mw project. So $2b MC in 10 years, 22 X of current MC. And of course the SP is forward looking, reserve size can be proven to 6tcf along the way and boost the MC by multiple times.
    Most important, SA has the backing of the BRICS to develop its infrastructure.
 
watchlist Created with Sketch. Add KKO (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
-0.005(6.85%)
Mkt cap ! $94.37M
Open High Low Value Volume
7.0¢ 7.0¢ 6.8¢ $9.262K 135.7K

Buyers (Bids)

No. Vol. Price($)
1 36933 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 144821 1
View Market Depth
Last trade - 13.52pm 24/05/2024 (20 minute delay) ?
Last
6.7¢
  Change
-0.005 ( 10.7 %)
Open High Low Volume
6.7¢ 6.7¢ 6.7¢ 7140
Last updated 11.54am 24/05/2024 ?
KKO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.