I think we are all on the right track here , before or after Xmas really means nothing ! A question for some of the more experienced here ,
@Scarpa good question for you mate .
The mineral resource over the Kibali South Gold Project has been calculated as 28.1Mt at an average grade of 1.63g/t of gold for 1.47 million ounces at a 0.5g/t cut-off, all of which is in the Inferred Category.
These estimates are considered historical and foreign and are not reported in line with the JORC (2012) Code. A Competent Person has not done sufficient work to classify these estimates under the JORC (2012) Code.
It is uncertain that following further work that the historical and foreign estimates will be able to be reported as mineral resource in accordance with the JORC (2012) Code. Further details are to be found in JORC Table 1 in the Appendix of this announcement
I was not sure if the VEC team under the scrutiny of a competent person could convert the information at hand over to a JORC (2012 Code ) Suitable for ASX / Australian Codes !
The guys that did the original JORC
(Coffey ) ( Not to 2012 Code ) are highly experienced in Minimising Sample Error , its what they do as per below attachment.
http://www.coffey.com/en/ingenuity-coffey/minimising-sample-error/
It’s essential to verify the quality of sample data and apply effective statistical methods that can measure variability correctly”.
If you could ensure the correct measurement of sample error, what would it mean for your project?
They have offices worldwide and one in WA
http://www.coffey.com/en/about-us/contact-our-offices/office/76/perth
Level 1, Bishops See, 235 St Georges Terrace
Western Australia 6000 Australia
Phone:+ 61 8 6218 2100
Nice and close to home for Jason Brewer hey
I guess I'm asking if all samples have been taken and secured correctly ( And i think they have now we know who has done the work ) Whats the process now ??? My thoughts are if we can get to JORC 2012 Code quickly and with very little outlay of cash , well happy days I would say !