Had a skim through, goodness this is a big appetizer to digest
Kibali South - right next to africas biggest gold mine/producer
28.1Mt @1.63g/t for 1.47Moz
Add that to our current resource we already are at 2Moz locked in.
Nizi - historic production of 1.45Moz of gold @30g/t.....30g/t....lmao.
1.5Mt of gold tailings which has been drilled and assayed by SOKIMO. And another Baluma Oxide project exploration target between 206Koz - 1Moz.
In summary:
400Koz current
1.47Moz Kibali South
600Koz averaged Exploration target from Nizi
1.5Mt Gold tailings from Nizi.
1.45Moz @30g/t historic production from Nizi
That looks to be the appetizer only
Looks well on track to smash out the 4Moz target.
- Forums
- ASX - By Stock
- VEC
- Ann: Agreement with Sokimo on Multi-Million Ounce Gold Project
Ann: Agreement with Sokimo on Multi-Million Ounce Gold Project, page-8
-
- There are more pages in this discussion • 151 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)