    still 1.5 months remaining for ramp up as per latest indication.

    first year is 90% of nameplate.

    so if can go from Less than 10% to 90% production rate by start of June it will actually be "on track" !


    Processing
    Year 1 – 915,000t
    Years 2-10 – 1,000,000t
    Year 11 – 196,000t

    ASX / MEDIA RELEASE
    5 March 2024
    Alara commences concentrate production in Oman
    Alara Resources is pleased to announce the successful completion of commissioning and the
    commencement of concentrate production at its 1 MTPA1 Al Wash-hi – Majaza copper-gold mine and
    copper concentrate plant in Oman (Al Wash-hi – Majaza Mine or the Mine). The Al Wash-hi – Majaza
    Mine is owned and operated by Alara’s 51% joint venture company, Al Hadeetha Resources LLC (AHRL).
    Mine production will ramp up to full capacity over the next 2 to 3 months. The sale of the first shipment –
    approximately 1000 dry metric tons of copper concentrate – to Trafigura is expected in April 2024.
 
watchlist Created with Sketch. Add AUQ (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
-0.003(4.23%)
Mkt cap ! $48.83M
Open High Low Value Volume
7.2¢ 7.2¢ 6.8¢ $16.19K 231.9K

Buyers (Bids)

No. Vol. Price($)
1 14940 6.7¢
 

Sellers (Offers)

Price($) Vol. No.
7.5¢ 46600 2
View Market Depth
Last trade - 14.03pm 03/05/2024 (20 minute delay) ?
Last
6.8¢
  Change
-0.003 ( 8.11 %)
Open High Low Volume
7.1¢ 7.1¢ 6.8¢ 15284
Last updated 11.37am 03/05/2024 ?
AUQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.