So your an engineer in manufacturing of mining equipment ?
you should know that batch plant samples are not the same as bulk sample production
below is an excerpt from an established copper mine who's guidance changed due to engineering issues of one part from production.
However, Carrapateena’s remediation plan has been adversely impacted by further conveyor belt issues on the material handling system (resulting in a reduction of about 4300 tonnes of copper metal produced), as well as ongoing resourcing and supply chain issues impacting equipment availability.
- Forums
- ASX - By Stock
- Ann: Al Wash-hi Majaza Copper Project Update
So your an engineer in manufacturing of mining equipment ? you...
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
-0.003(4.23%) |
Mkt cap ! $48.83M |
Open | High | Low | Value | Volume |
7.2¢ | 7.2¢ | 6.8¢ | $16.19K | 231.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14940 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 46600 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14940 | 0.067 |
2 | 305000 | 0.065 |
1 | 15625 | 0.064 |
1 | 2876 | 0.063 |
3 | 124377 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 46600 | 2 |
0.078 | 40000 | 1 |
0.079 | 300000 | 2 |
0.080 | 299999 | 2 |
0.081 | 300000 | 2 |
Last trade - 14.03pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
6.8¢ |
  |
Change
-0.003 ( 8.11 %) |
|||
Open | High | Low | Volume | ||
7.1¢ | 7.1¢ | 6.8¢ | 15284 | ||
Last updated 11.37am 03/05/2024 ? |
Featured News
AUQ (ASX) Chart |