"However, Carrapateena’s remediation plan has been adversely impacted by further conveyor belt issues..."
Exactly what I'm talking about. How many mining conveyor belts do you reckon would be in the world? and just imagine how much is known about conveyor belts. Clearly there was a mismatch between the equipment supplied to the mining company and what the mining situation required.
It leaves me wondering about the state of mining engineering.
I can understand there may be certain situations where a process of on-site trial and error is required to resolve certain issues to meet performance requirements but Jesus, the number of times equipment failure delays commissioning is out of control IMO.
- Forums
- ASX - By Stock
- Ann: Al Wash-hi Majaza Copper Project Update
"However, Carrapateena’s remediation plan has been adversely...
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.3¢ |
Change
0.004(5.80%) |
Mkt cap ! $52.42M |
Open | High | Low | Value | Volume |
7.5¢ | 7.5¢ | 7.0¢ | $20.74K | 284.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 38625 | 7.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 21599 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38625 | 0.073 |
1 | 28571 | 0.070 |
1 | 17000 | 0.069 |
1 | 13529 | 0.068 |
2 | 54940 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 21599 | 1 |
0.078 | 53100 | 2 |
0.079 | 300000 | 2 |
0.080 | 301144 | 3 |
0.081 | 300000 | 2 |
Last trade - 15.27pm 07/05/2024 (20 minute delay) ? |
|
|||||
Last
7.3¢ |
  |
Change
0.004 ( 5.80 %) |
|||
Open | High | Low | Volume | ||
7.3¢ | 7.3¢ | 7.0¢ | 31696 | ||
Last updated 15.08pm 07/05/2024 ? |
Featured News
AUQ (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online