AUQ 1.52% 6.7¢ alara resources limited

Ann: Al Wash-hi Majaza Copper Project Update, page-69

  1. 2,855 Posts.
    lightbulb Created with Sketch. 309

    "However, Carrapateena’s remediation plan has been adversely impacted by further conveyor belt issues..."

    Exactly what I'm talking about. How many mining conveyor belts do you reckon would be in the world? and just imagine how much is known about conveyor belts. Clearly there was a mismatch between the equipment supplied to the mining company and what the mining situation required.

    It leaves me wondering about the state of mining engineering.

    I can understand there may be certain situations where a process of on-site trial and error is required to resolve certain issues to meet performance requirements but Jesus, the number of times equipment failure delays commissioning is out of control IMO.





 
watchlist Created with Sketch. Add AUQ (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
0.001(1.52%)
Mkt cap ! $48.11M
Open High Low Value Volume
6.9¢ 6.9¢ 6.7¢ $3.008K 44.89K

Buyers (Bids)

No. Vol. Price($)
1 200000 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 44776 1
View Market Depth
Last trade - 14.50pm 07/06/2024 (20 minute delay) ?
Last
6.7¢
  Change
0.001 ( 3.08 %)
Open High Low Volume
6.7¢ 6.7¢ 6.7¢ 35934
Last updated 11.16am 07/06/2024 ?
AUQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.