MAY 4.35% 2.4¢ melbana energy limited

Ann: Alameda-1 Drilling Update, page-109

  1. 4,618 Posts.
    lightbulb Created with Sketch. 1824
    Actually MAY retains 30%, but incurs 15% of costs.
    As VOGC has indicated the schematic is designed to provide a visual of the various features/structures rather than being a true indication of depth. And bear in mind the hole wasn't drilled vertical, it was inclined from spud in order to encounter the targeted areas that don't lie on the 1 plane.
    The main targets are well below the current depth from my understanding. Whilst there's never a guarantee I plan to hold for those deeper targets, the shallower zone is interesting but it's not the real zone of interest - but if the wireline indicates otherwise then it's a bonus.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.001(4.35%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.4¢ 2.4¢ 2.3¢ $68.51K 2.960M

Buyers (Bids)

No. Vol. Price($)
4 338720 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 2244796 10
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.