MAY 0.00% 4.9¢ melbana energy limited

Ann: Alameda-1 Drilling Update, page-25

  1. 3,072 Posts.
    lightbulb Created with Sketch. 997
    Goods news, they had previous reservoir data to calculate mud weight, to have to flare to pit and increase the weight is telling me the reservoir pressure is greater than expected
    This IMO is a good sign or the mud engineer is crap at math
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.9¢
Change
0.000(0.00%)
Mkt cap ! $165.1M
Open High Low Value Volume
4.9¢ 5.0¢ 4.8¢ $74.11K 1.515M

Buyers (Bids)

No. Vol. Price($)
20 1286827 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 365508 2
View Market Depth
Last trade - 16.10pm 17/05/2024 (20 minute delay) ?
Last
4.9¢
  Change
0.000 ( 0.20 %)
Open High Low Volume
4.9¢ 4.9¢ 4.8¢ 1248447
Last updated 15.57pm 17/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.