MAY 28.1% 2.3¢ melbana energy limited

Ann: Alameda-1 Drilling Update, page-12

  1. 9,676 Posts.
    lightbulb Created with Sketch. 3054
    it just means they may have found the bottom of the structure and being that it’s been drilled down dip, there’s a minimum of 500m gross interval in the Marti structure. This is a good outcome, they’re side tracking to perform a flow test, they wouldn’t do this if it wasn’t looking positive.
    Last edited by jakspara: 29/03/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.009(28.1%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.8¢ 2.9¢ 2.1¢ $1.656M 68.27M

Buyers (Bids)

No. Vol. Price($)
4 3909224 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 2254933 11
View Market Depth
Last trade - 16.10pm 11/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.