Hi All,
My summary of the ASX 29/3/22 is below. I've included in it key comments from the Investor Stream Interview with AP on the 31/3/22.
Key points from both:
- based on the Alameda (formally N) reservoir's N / G - IMO, I'd expect ~40m of Net Pay from the Marti reservoir
- if the Formation water was due to intersecting the Oil Water Contact, IMO, I would have expected water to have been seen while drilling
- in the IS Interview AP mentioned that the Side Track will provide a "clean section" - VERY important as will be able to drill the ST with correct mud weight etc. and minimise invasion of drilling mud / fluids into the reservoir section to be tested
- hopefully, in Net Pay update, MAY will report on the potential N / G for the 500mTVD Marti reservoir section that exists from the top of the mapped structure to current TVD location - IMO, based on the Alameda (formally N) reservoir's N / G, I'd expect ~88m of Net Pay for the full Marti section
Back-up Slides deal with some reasons why Formation water has been detected, other than intersecting the OWC, and the Invasion Zone issue.
GLTAH
Cheers
VOGC
- Forums
- ASX - By Stock
- MAY
- Ann: Alameda-1 Drilling Update
Ann: Alameda-1 Drilling Update, page-485
-
- There are more pages in this discussion • 159 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
-0.028(45.9%) |
Mkt cap ! $111.2M |
Open | High | Low | Value | Volume |
6.1¢ | 6.3¢ | 3.2¢ | $3.849M | 101.0M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 3966517 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 1034998 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 3966517 | 0.032 |
10 | 618028 | 0.031 |
17 | 1824666 | 0.030 |
1 | 222222 | 0.029 |
9 | 448500 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.033 | 1034998 | 2 |
0.034 | 1174829 | 6 |
0.035 | 552658 | 3 |
0.036 | 2623555 | 4 |
0.037 | 2122333 | 2 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |