Andrews words were "the Marti structure is clearly the most exciting of the three structure". What i cant understand is he makes this statement even though they cant flow test due to high pressure. Is there something hugh he sees there of elephant proportions that he cant disclose as he wasnt able to show due to failure of flow test.
Are the masses been led to drop down the hill or is there a hidden message of a massive elephant reserviour.
imo he would have been saying something like"i regret or and disappointed with...marti" if it was a crap well.
in the meantime I continue to be soothed and hopefully not fooled by his words. But it won't happen until MAY! Happy Easter and the oil is still there even as the share slides sideways. Hope MAY is a Gusher in May.
- Forums
- ASX - By Stock
- MAY
- Ann: Alameda-1 Drilling Update
Ann: Alameda-1 Drilling Update, page-223
-
- There are more pages in this discussion • 509 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.001(3.13%) |
Mkt cap ! $111.2M |
Open | High | Low | Value | Volume |
3.3¢ | 3.4¢ | 3.3¢ | $67.83K | 2.054M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 254456 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 1556167 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 254456 | 0.033 |
2 | 573193 | 0.032 |
5 | 497000 | 0.031 |
7 | 585066 | 0.030 |
6 | 1025154 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 1556167 | 6 |
0.035 | 1959500 | 4 |
0.036 | 1529408 | 3 |
0.037 | 900014 | 2 |
0.038 | 203500 | 4 |
Last trade - 15.23pm 27/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |