The shallow top section that was a gift and basically de risked the hole (as a discovery) was severely compromised during drilling and will be targeted with its own hole, this has been announced during drilling last year, the bottom has been plugged with 250m of concrete, what's left to run as a production hole?
- Forums
- ASX - By Stock
- MAY
- Ann: Alameda-1 Drilling Update
Ann: Alameda-1 Drilling Update, page-669
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.001(3.13%) |
Mkt cap ! $111.2M |
Open | High | Low | Value | Volume |
3.3¢ | 3.4¢ | 3.3¢ | $67.83K | 2.054M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 254456 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 1556167 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 254456 | 0.033 |
2 | 573193 | 0.032 |
5 | 497000 | 0.031 |
7 | 585066 | 0.030 |
6 | 1025154 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 1556167 | 6 |
0.035 | 1959500 | 4 |
0.036 | 1529408 | 3 |
0.037 | 900014 | 2 |
0.038 | 203500 | 4 |
Last trade - 15.23pm 27/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |