MAY 1.43% 6.9¢ melbana energy limited

Giose, by yr post, you seem to perhaps have limited knowledge of...

  1. 225 Posts.
    lightbulb Created with Sketch. 8
    Giose, by yr post, you seem to perhaps have limited knowledge of the oil/gas industry and particularly pipeline technology and engineering. Not that many people are experienced in overseas pipeline construction admittedly.
    In the webinar, it was said the existing pipeline is old and not suitable for our use.
    If we find copious amounts of oil, trucking is not an option long term and a new pipeline would be needed. Its no big deal as we can follow the existing easement as stated. Sure it all has to be designed by pipeline engineers and constructed by professionals but its all doable, no problems.
    If all goes well, I suspect we could well have a new pipeline carrying our oil to the oil refinery 50km away in less than 2 years.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
6.9¢
Change
-0.001(1.43%)
Mkt cap ! $232.5M
Open High Low Value Volume
7.0¢ 7.0¢ 6.8¢ $275.1K 3.983M

Buyers (Bids)

No. Vol. Price($)
1 289170 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 560000 2
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
6.9¢
  Change
-0.001 ( 1.85 %)
Open High Low Volume
7.0¢ 7.0¢ 6.8¢ 2492935
Last updated 15.59pm 14/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.