MAY 4.35% 2.2¢ melbana energy limited

Ann: Alameda-1 Significant oil pay defined in Marti structure, page-284

  1. 3,809 Posts.
    lightbulb Created with Sketch. 533
    Hey@Kangaroos67 - I am also keen to see that lower 16m high/over pressure section, and beyond.
    My expectation is that it will require a different drilling rig able to handle the higher pressures, hence that rig will need to be sourced, landed and established. That is cost and time , but MAY has cash in bank, Solangol has financial resources, and both have motivation to spend as this looks like it would be a significant reservoir able to be put into production. Time is not really an issue IMO as MAY will be fully occupied on current well work for a couple weeks then Zapato though to June, so if new higher capacity/pressure drill takes 3 months to be ready to drill Marti in July, then that fits the program. I am not experienced in drilling, so would welcome critical review of my thoughts. Also would this higher pressure/capacity drill be able to then make Marti ready for production?

    Last edited by curiouswon: 08/04/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.