MAY 2.17% 2.4¢ melbana energy limited

Ann: Alameda-1 Significant oil reservoir interpreted in N Struct, page-236

  1. 7,166 Posts.
    lightbulb Created with Sketch. 847
    Sam, when it rains gold, better to put out a bucket rather than a thimble. You are looking at a once in a lifetime opportunity.... And the main.'primary target' Alameda hasn't even been entered yet.... Flow test of the N zone is locked in even before the logs were completed and if Alameda comes too it will also be flow tested... Then there is the next well up... Zapato straight after...... All of these things are elevating other leads in the joint venture block 9.
    Does that help grasp the enormity of what we are dealing with here.....? Where was the bit about the N possibly besting there best prediction and possible upgrade to the net pay.....
    Yep parking mine for awhile... Block 9 is biiiiig !
    Pass me another rake, this one's broke tc.
    Last edited by thecone: 25/02/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.001(2.17%)
Mkt cap ! $79.19M
Open High Low Value Volume
2.4¢ 2.4¢ 2.3¢ $18.22K 784.8K

Buyers (Bids)

No. Vol. Price($)
15 2146133 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 1371971 7
View Market Depth
Last trade - 13.24pm 25/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.