MAY 3.57% 2.7¢ melbana energy limited

Ann: Alameda 2 Drilling Update, page-254

  1. 4,583 Posts.
    lightbulb Created with Sketch. 804
    Thats the crazy thing I don't think the plan had ever changed in Sheritts mind. Was always going to go to 500m as the first casing point and 1600m as the second casing point yet AP puts out a stupid comment in the previous announcement of a "flow" test of 1B. How exactly were they going to flow test an open hole 700meter interval from the first casing point and let the hole destroy itself.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
-0.001(3.57%)
Mkt cap ! $90.99M
Open High Low Value Volume
2.9¢ 2.9¢ 2.7¢ $87.74K 3.087M

Buyers (Bids)

No. Vol. Price($)
5 848777 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 284679 3
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.