MAY 3.13% 3.3¢ melbana energy limited

Ann: Alameda 2 Drilling Update, page-310

  1. 3,657 Posts.
    lightbulb Created with Sketch. 857
    The debate about flow testing vs not flow testing 1b - let’s not forget that they could not log approx 200 meters the first time they drilled the hole - due to unstable conditions.
    Does anyone think they will be repeating the same mistake in that unstable zone by conducting open hole flow and let it cave in.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.001(3.13%)
Mkt cap ! $111.2M
Open High Low Value Volume
3.3¢ 3.4¢ 3.3¢ $67.83K 2.054M

Buyers (Bids)

No. Vol. Price($)
4 254456 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 1556167 6
View Market Depth
Last trade - 15.23pm 27/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.