And from what I recall the pressure was more like 5000 PSI in Amistad zone 3. Anyway regardless it’s the porosity and permeability and not so much the pressure. They’re the most important things and if the oil is in place in these qtys they can get it out especially in the shallow amistad - Its only a matter of 24 months time until there will be 5x 1000m- 2000m long Horizontals 500m - 1500m deep hanging of Alameda, plus A3 into Alameda and Marti producing a combined 40,000bbl per day.
They’ll need more than trucks for that. A Pipeline (AP mentioned preliminary design works were underway) will be required for anything more than 10k bopd off Alameda 1 pad. Envelope calcs
190 barrel per tanker
5 trucks
10 trips per day
190x5x10=9500 bbl per day
Buffer tanks already on site = 1500 bbl
- Forums
- ASX - By Stock
- MAY
- Ann: Alameda 2 First Production Results
Ann: Alameda 2 First Production Results, page-187
-
-
- There are more pages in this discussion • 360 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
-0.001(4.35%) |
Mkt cap ! $74.14M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.1¢ | $444.7K | 19.98M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 2048367 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 1402823 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 650000 | 0.022 |
21 | 2312018 | 0.021 |
29 | 4624745 | 0.020 |
11 | 1388627 | 0.019 |
3 | 535055 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 1311657 | 4 |
0.024 | 3142174 | 9 |
0.025 | 3859683 | 6 |
0.026 | 326965 | 4 |
0.027 | 2632940 | 7 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |