MAY 4.35% 2.2¢ melbana energy limited

Ann: Alameda 2 First Production Results, page-187

  1. 7,851 Posts.
    lightbulb Created with Sketch. 1522
    And from what I recall the pressure was more like 5000 PSI in Amistad zone 3. Anyway regardless it’s the porosity and permeability and not so much the pressure. They’re the most important things and if the oil is in place in these qtys they can get it out especially in the shallow amistad - Its only a matter of 24 months time until there will be 5x 1000m- 2000m long Horizontals 500m - 1500m deep hanging of Alameda, plus A3 into Alameda and Marti producing a combined 40,000bbl per day.

    They’ll need more than trucks for that. A Pipeline (AP mentioned preliminary design works were underway) will be required for anything more than 10k bopd off Alameda 1 pad. Envelope calcs

    190 barrel per tanker
    5 trucks
    10 trips per day
    190x5x10=9500 bbl per day
    Buffer tanks already on site = 1500 bbl
    Last edited by justinmetals: 05/07/23
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.