Hi All,
For those interested just posting a summary of my review of yesterday's ASX 5/7/23 on Unit 1A's results so far. IMO, all very positive, obviously its ability to flow under its own pressure as well as the cores have confirmed that the fractures are open at this level - bodes very well for the rest of the Amistad reservoirs.
As has been common with MAY's reporting terminology can be confusing on occasions, but I'm looking at the information and what I believe can be viably gleaned from it optimistically.
Points in Slide 1 relate to Slide 2. I've included in Slide 7 (not referenced to in Slide 1) the seismic section from the ASX. I'm not sure how MAY are defining Unit 1B's top sealing mechanism at this point in time.
GLTAH
Cheers
VOGC
- Forums
- ASX - By Stock
- Ann: Alameda 2 First Production Results
Hi All,For those interested just posting a summary of my review...
-
-
- There are more pages in this discussion • 300 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.2¢ |
Change
0.001(4.76%) |
Mkt cap ! $74.14M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.2¢ | $1.317K | 59.85K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 510324 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 2145000 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 510324 | 0.022 |
16 | 2874203 | 0.021 |
26 | 4586319 | 0.020 |
6 | 1029920 | 0.019 |
4 | 677480 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 2100000 | 6 |
0.024 | 1416395 | 6 |
0.025 | 889441 | 5 |
0.026 | 115955 | 3 |
0.027 | 100000 | 1 |
Last trade - 10.04am 16/08/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & Managing Director
Charles Armstrong
CEO & Managing Director
SPONSORED BY The Market Online