MAY 9.52% 2.3¢ melbana energy limited

Ann: Alameda-2 - Successful Flow Test of Lighter Oil to Surface, page-659

  1. 223 Posts.
    lightbulb Created with Sketch. 279
    https://hotcopper.com.au/data/attachments/5556/5556494-ef93ce687cc886b944590357f5061614.jpg
    https://hotcopper.com.au/data/attachments/5556/5556497-9d374b270aa123849ccb979288e7bf05.jpg
    I'm not sure if folks picked this up during the last webinar but it seems that they're pretty clear about where one of the new well pads will be located. It's to the south and Errol had an orange line (1st diagram) showing a vertical well. I've tried to transpose that line approximately on the broader structure and I believe the intent was to get to the crest of Alameda (N) and Marti (I).

    If these structures are as diagrammatically depicted - Unit 1B is bloody massive (for scale - Unit 1A in green is about 120m). Also note that they only perforated 70m (or less than 20%) for the flow test - all in the UPPER SECTION of Unit 1B.

    So I think this forms the part of the forward program (2024) along with finishing the Zapato story. All IMHO. Not financial. DYOR.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.002(9.52%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $83.23K 3.644M

Buyers (Bids)

No. Vol. Price($)
5 310691 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3542587 7
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.