MAY 3.13% 3.3¢ melbana energy limited

Ann: Alameda-2 - Successful Flow Test of Lighter Oil to Surface, page-660

  1. 293 Posts.
    lightbulb Created with Sketch. 281
    Thanks Teji,
    And looking more closely at the presentation slide.. it could be that there’s a twinned hole planned (second orange angled line that pushes through the basal structure of fault repeat unit 3) and a ‘potential planned’ well (green line) that intersects Alameda 2 and proposed Alameda 3, finishing in Alameda unit 3?
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.