MAY 9.52% 2.3¢ melbana energy limited

Ann: Alameda-2 - Successful Flow Test of Lighter Oil to Surface, page-660

  1. 293 Posts.
    lightbulb Created with Sketch. 281
    Thanks Teji,
    And looking more closely at the presentation slide.. it could be that there’s a twinned hole planned (second orange angled line that pushes through the basal structure of fault repeat unit 3) and a ‘potential planned’ well (green line) that intersects Alameda 2 and proposed Alameda 3, finishing in Alameda unit 3?
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.002(9.52%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $83.23K 3.644M

Buyers (Bids)

No. Vol. Price($)
5 310691 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3542587 7
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.