MAY 0.00% 2.6¢ melbana energy limited

Ann: Alameda-2 - Successful Flow Test of Lighter Oil to Surface, page-661

  1. 331 Posts.
    lightbulb Created with Sketch. 7179
    Hi All,

    For those interested, just posting my summary notes from the 28/8/23 Webinar. A great result & lot of information to digest, correlate & cross reference.
    Points in Slides 1 & 2 relate to the same points in Slides 3 to 5.
    Slides 6 to 9 are Slides referenced in Slides 1 & 2.
    Slides 10 to 18 are Slides from the presentation that I've summarised key information onto.

    One point - my understanding is that Unit 2 is now considered to be a basal section of Unit 1B and even though DL did refer to it specifically as Unit 2 at the 58.55 mark I'm pretty sure that this was an error on this part.

    AP is very strongly focusing on production ASAP. I've mentioned and copied in Slide 8, a number of comments AP made in an Interview back on the 28/6/22 (The Good Oil with Scott Phillips) with respect to Issues Market is likely to still have with project in Cuba. Hopefully, any near term production from Unit 1B in Alameda-2 & Alameda-1 (hoping this will occur) will start to get the Market over these hurdles that AP identified.

    GLTAH
    Cheers
    VOGC

    https://hotcopper.com.au/data/attachments/5557/5557224-d8d196094de5bf167d4a5f729395daa0.jpg


    https://hotcopper.com.au/data/attachments/5557/5557226-1fa96dbd0411a2756c9ef42b85d82b9d.jpg


    https://hotcopper.com.au/data/attachments/5557/5557229-85e5f9ece55d270bf650c39edc91039a.jpg


    https://hotcopper.com.au/data/attachments/5557/5557231-7d9cacaa657115f3091d1192734b03b2.jpg


    https://hotcopper.com.au/data/attachments/5557/5557234-54e03f08b22da782ec1cab8a9df4cfdf.jpg


    https://hotcopper.com.au/data/attachments/5557/5557236-9a5290205bc91d76753cde3ac67466d6.jpg


    https://hotcopper.com.au/data/attachments/5557/5557239-53eadd5dd5ab059631b4d9295d5589cc.jpg


    https://hotcopper.com.au/data/attachments/5557/5557245-8f7661a2e9a8fea520ed6a4e974ce10e.jpg


    https://hotcopper.com.au/data/attachments/5557/5557246-84ff61814ae6073611a589ca78f33d02.jpg


    https://hotcopper.com.au/data/attachments/5557/5557249-8fa11c487274f5c64844f38ed654ecbe.jpg


    https://hotcopper.com.au/data/attachments/5557/5557250-5672aab8bb2d407441165f4d6c224979.jpg


    https://hotcopper.com.au/data/attachments/5557/5557252-fd5c092905e9d5b2a025cde3f9db0d88.jpg


    https://hotcopper.com.au/data/attachments/5557/5557253-5259c99fc6f452445067a5d6d44e16f0.jpg


    https://hotcopper.com.au/data/attachments/5557/5557256-c3999e31181df0191e78098fc3990be4.jpg


    https://hotcopper.com.au/data/attachments/5557/5557259-d8ba9579f0a96001c2cd743f1fca7898.jpg


    https://hotcopper.com.au/data/attachments/5557/5557260-26d539c026b1577433a971328aac4f8f.jpg


    https://hotcopper.com.au/data/attachments/5557/5557263-119ee336fded7b09331e889b02030bbe.jpg


    https://hotcopper.com.au/data/attachments/5557/5557269-fd062b2ce5f0603a161555611b3512f7.jpg
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.000(0.00%)
Mkt cap ! $84.25M
Open High Low Value Volume
2.6¢ 2.6¢ 2.5¢ $35.39K 1.406M

Buyers (Bids)

No. Vol. Price($)
4 132740 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 936112 4
View Market Depth
Last trade - 14.05pm 18/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.