MAY 40.9% 3.9¢ melbana energy limited

Ann: Alameda-3 Drilling Update, page-118

  1. 7,563 Posts.
    lightbulb Created with Sketch. 837
    Everyone is talking about topping up and "backing up the truck". But the volume would suggest that noone is actually doing this. I call BS. soz.

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.027(40.9%)
Mkt cap ! $134.8M
Open High Low Value Volume
3.9¢ 4.4¢ 3.6¢ $1.869M 46.87M

Buyers (Bids)

No. Vol. Price($)
15 4106711 3.8¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 500000 1
View Market Depth
Last trade - 11.21am 18/06/2024 (20 minute delay) ?
Last
4.0¢
  Change
-0.027 ( 40.3 %)
Open High Low Volume
3.8¢ 4.4¢ 3.6¢ 24179309
Last updated 11.45am 18/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.