Management said they were running 24/5 with 2 daily shifts to get into the 1080 level. Each shift advances approximately 2.5 metres.
My sense is that the 1080 level width of mineralisation may be more consistent (wider??) than the stuff they pulled on the 1100 level. First indication is in the photo.
ORS Price at posting:
2.0¢ Sentiment: Buy Disclosure: Held
HotCopper & The Market Online will be live From the Floor at the Mining News Select Conference and we want to bring the voice of our online audience to the show with us.