Management said they were running 24/5 with 2 daily shifts to get into the 1080 level. Each shift advances approximately 2.5 metres.
My sense is that the 1080 level width of mineralisation may be more consistent (wider??) than the stuff they pulled on the 1100 level. First indication is in the photo.
ORS Price at posting:
2.0¢ Sentiment: Buy Disclosure: Held