Jackofall I think you have forgotten what I posted on 26/08/2018 (and to which you replied)
https://hotcopper.com.au/posts/35185217/single
The last paragraph I wrote is still correct imo.
I believe the Pioneer Status application is all good but suspended untilthe company can confidently commit to this ‘production date’ and remain withinthe 2 year period.
There is no rush for them to do that and after finance close and completion ofphase 1 construction they’ll be in a much better position to estimate theproduction date for the application to proceed.
Assuming we complete the plant, produce 4N HPA and the tax incentive is still on offer, then I have no doubt we will obtain the 'Pioneer Certificate'.
- Forums
- ASX - By Stock
- Ann: Altech - HPA Plant Construction Update
Jackofall I think you have forgotten what I posted on 26/08/2018...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.9¢ |
Change
-0.001(2.00%) |
Mkt cap ! $94.85M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 4.7¢ | $123.2K | 2.527M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1887112 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 332497 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 1887112 | 0.047 |
4 | 1234817 | 0.046 |
7 | 283522 | 0.045 |
8 | 1524181 | 0.044 |
2 | 282052 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 332497 | 3 |
0.050 | 135000 | 2 |
0.051 | 336288 | 4 |
0.052 | 247978 | 3 |
0.053 | 130200 | 3 |
Last trade - 16.10pm 28/10/2024 (20 minute delay) ? |
Featured News
ATC (ASX) Chart |