This announcement is for the GridPack design. How can economics be completed on a project where the product design has just been completed? It's all part of preparing the DFS. The JV was announced in September 2022. If you can do economics on a project at this stage you must have a crystal ball, be speculating or be premature.
- Forums
- ASX - By Stock
- ATC
- Ann: Altech - Launch of CERENERGY 1.0MWh GridPack Design
Ann: Altech - Launch of CERENERGY 1.0MWh GridPack Design, page-45
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.6¢ |
Change
0.001(1.82%) |
Mkt cap ! $94.08M |
Open | High | Low | Value | Volume |
5.6¢ | 5.7¢ | 5.6¢ | $36.91K | 659.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 60000 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 32329 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 296282 | 0.054 |
2 | 65969 | 0.053 |
15 | 713549 | 0.052 |
7 | 930705 | 0.051 |
31 | 1468500 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.056 | 32329 | 2 |
0.057 | 241003 | 2 |
0.058 | 190382 | 2 |
0.059 | 240000 | 2 |
0.060 | 644317 | 4 |
Last trade - 10.04am 14/06/2024 (20 minute delay) ? |
|
|||||
Last
5.6¢ |
  |
Change
0.001 ( 1.82 %) |
|||
Open | High | Low | Volume | ||
5.6¢ | 5.6¢ | 5.6¢ | 28096 | ||
Last updated 10.00am 14/06/2024 ? |
Featured News
ATC (ASX) Chart |