ATC 0.00% 5.0¢ altech batteries ltd

Ann: Altech submits Mining Proposal and Mine Closure Plan, page-2

  1. 15,025 Posts.
    lightbulb Created with Sketch. 556
    Highlights :
    Meckering mining proposal and mine closure plan submitted to DMP 
    Proposed mining activity is a simple quarry style operation, no drill and blast required 
    Two month mining campaign first 3 years kaolin feedstock

    Year-round kaolin container loading operation at Meckering site 
    Containers shipped to HPA plant in Johor via port of Fremantle, Western Australia

    I cannot believe how easy and cheap this operation will be. At least getting it out of the ground and the purification process looks fairly simple as well.

    Two months of mining will see enough kaolin feedstock for the first 3 years of operations!

    All just a simple quarry operation. Market is missing this one or maybe there just isn't enough hype around for them to run with it.
 
watchlist Created with Sketch. Add ATC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.