"but the project either would need to stack up on the minimum price level"
Seriously? Go read the DFS. Was based on $539/tonne. Floor price of this BOA is $550/tonne. i.e minimum floor is above the feasibility study, i.e proof the project is economically viable.
Payback period from the DFS is 1.8 years. Floor price is in place for 3 years. i.e they have almost twice the time they need to payback any debt at the floor price.
Based on current prices they will be able to pay debt back in essentially a single year.
- Forums
- ASX - By Stock
- Ann: Altura Completes Two Binding Offtake Agreements
"but the project either would need to stack up on the minimum...
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.789M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.9¢ | $9.644K | 332.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 355011 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 153700 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 355011 | 0.029 |
5 | 108963 | 0.028 |
3 | 134687 | 0.027 |
2 | 39000 | 0.025 |
1 | 200000 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 153700 | 1 |
0.031 | 638736 | 5 |
0.032 | 39281 | 2 |
0.033 | 41913 | 2 |
0.034 | 269773 | 1 |
Last trade - 15.50pm 05/11/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |