JAGUAR DIAMOND DRILLING - HIGHER GRADES/INCREASED THICKNESS
The Directors of Pilbara Mines Ltd (Pilbara) are pleased to advise shareholders and the
market of initial results of the current diamond drill program at Pilbara’s 100% owned Jaguar
Base Metal Project (copper, zinc, silver). As announced on 9th October 2003, drilling is
progressing well, with results now becoming available.
Drill hole TBD 241, drilled to confirm continuity in an area of limited prior drilling, has
reported high grade massive sulphide (copper, zinc, silver) mineralisation as summarised
below:
Hole No From To Metres %Cu %Zn g/tAg
TBD 241 552.33 556.00 3.67 7.36 10.95 233
This is a very impressive result with the copper and silver grades nearly twice the average
grade for the deposit to date.
Drill hole TBD 242 was completed at 732.4m and intersected 1.16m of high grade massive
sulphide (copper, zinc, silver) mineralisation. (Results are awaited). As reported, this hole
confirmed the continuation of the Jaguar mineralisation down plunge to –200 RL and extends
the known mineralisation a further 130m down dip on section 56100N. This result is likely to
upgrade the resource in this area to the Indicated category.
Drill hole TBD 242W, a wedge off TBD242 was drilled to intersect the massive sulphide ore
zone approximately 75 m above TBD 242, in an area of limited prior drilling. This hole was
completed at 657.8m and intersected 7.00 metres of high grade massive sulphide (copper,
zinc, silver) mineralisation as summarised below. (Results are awaited).
Hole No From To Metres Description
TBD 242W 620.56 627.52 7.00 High grade copper, zinc, silver
Pilbara Mines Limited 2
This result shows a significant thickening of massive sulphide mineralisation in this area
beyond the 1 metre contour outlined within the existing inferred resource. As a result, this
will increase the resource base and upgrade the ore classification in this area. The current
drilling programme to date has further upgraded the Jaguar deposit by continuing to provide
increased ore thickness and/or depth extensions to the mineralisation.
Sampling of the footwall stringer zone in holes TBD237 and TBD238 has reported areas of
copper and zinc grades in excess of 1.0% Cu and gold grades to 0.7 g/t. This information will
be incorporated into the resource model and will have a positive impact on the mine design
parameters.
Drilling will continue on the current programme with a further four holes to be completed,
two within the Jaguar ore zone and two exploration holes, one targeting an off hole EM
conductor south of Jaguar and another an up dip position within the Jaguar EM conductor.
The attached long section sets out the position of the current drill holes and the planned
additional drill holes.
Yours faithfully
Pilbara Mines Limited
Denis Waddell
Managing Director
ASX_PIL_14October2003
ASX Code: PIL
Options Code: PILOA
NOTE: This report, so far as it pertains to ore and mineralisation, is based on information compiled by and as
reported upon by Mr. J Davis, who is a member of the Australasian Institute of Mining and Metallurgy and has
more than 25 years experience in the field of activity concerned. Rule 5.3
56200 N
North
Surface 451m RL
100m RL
0m RL
-100m RL
-200m RL
56100 N 56000 N 55900 N 55800 N 55700 N
EDIHPLUS EVISSAM FO TIMIL
EDIHPLUS EVISSAM FO TIMIL
1
3
5
7
?
?
5
5
3
1
7
TBD 226
TBD 213 (3.0m)
7.53, 12.21, 209
TBD 234 (5.9m)
1.69, 8.72, 89
TBD 234 (4.2m)
7.48, 12.94, 146
TBD 209 (4.0m)
3.16, 9.25, 155
TBD 227
TBD 215
TBD 216
TBD 208 (0.2m)
5.0, 14.3, 124
TBD 218 (5.4m)
3.82, 8.32, 114
TBD 222 (0.5m)
0.73, 5.01, 48
TBD 237 (1.8m)
2.67, 10.10, 81
TBD 207 (8.5m)
5.0, 14.9, 147
TBD 239 (8.9m)
4.91, 10.96, 123
TBD 214 (0.3m)
2.82, 16.5, 100
TBD 225
TBD 217 (1.7m)
4.34, 9.02, 83
TBD 238 (5.3m)
4.05, 11.75, 200
TBD 205W (1.8m)
0.8, 12.5, 180
TBD 205 (2.4m)
5.7, 10.6, 120
TBD 238 (4.3m)
6.71, 11.58, 111
TBD 220 (0.1m)
0.82, 3.83, 60
TBD 212 (3.7m)
2.9, 13.89, 173
TBD 219 (4.0m)
4.05, 12.52, 153
TBD 224
TBD 223 (1.8m)
2.88, 9.53, 223
TBD 210 (6.9m)
1.86, 16.55, 93
TBD 210W (9.0m)
1.32, 20.13, 78
TBD 205 (2.5m)
2.7, 17.0, 123
TBD 204
TBD 221 (7.1m)
0.56, 23.27, 149
TBD 235 (5.5m)
3.10, 13.3, 142
TBD 211
TBD 202 (4.9m)
4.28, 16.05, 173
TBD 228
TBD 206
TBD 234 (4.2m)
7.48, 12.94, 146
Hole number Horizontal
width
Massive
sulphide
intersection
% Zn % Cu
g/t Ag
FIGURE 1
JAGUAR PROJECT
LONGITUDINAL SECTION
ISOPACH (METRE CONTOURS)
Completed holes
Planned holes
CL = Core Length
TBD 242
TBD 242W
TBD 241
TBD 240
TARGET
ABOVE
DYKE
OFF HOLE
EM CONDUCTOR
TARGET
TBD 241 (3.67m CL)
7.36, 10.95, 233
Re-interpreted contours:
- increased massive
sulphide thickness
TBD 242 (1.16m CL)
High grade Cu, Zn, Ag
Results pending
TBD 242W (7.0m CL)
High grade Cu, Zn, Ag
Results pending
- Forums
- ASX - General
- pil cheap entry availiable
pil cheap entry availiable
Featured News
Featured News
The Watchlist
MGU
MAGNUM MINING AND EXPLORATION LIMITED
Neil Goodman, MD
Neil Goodman
MD
Previous Video
Next Video
SPONSORED BY The Market Online