CMM can make money at 0.8-0.9 g/t. CAI can't. That's the difference.
With MOY, DCN, GCY, and CAI stuffing their resource models, I doubt any other 2-3Mtpa projects will get financing...Too many cowboys in the gold sector. A 5Mtpa mill has a lot more wiggle room.
- Forums
- ASX - By Stock
- Ann: Annual Mineral Resource and Ore Reserve Statement
CMM can make money at 0.8-0.9 g/t. CAI can't. That's...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable