SP8 0.00% 0.7¢ streamplay studio limited

IMO we have not been adequately informed regarding the tin...

  1. 743 Posts.
    IMO we have not been adequately informed regarding the tin shipments, alluvials, alluvial problems and wet screening, and neither have we been informed in a timely.

    I fail to see why there was a need to install a wet screening plant at all as according the my weather APPs, ambient temperatures rarely fall below 35 degrees in Central Eastern Desert where the climate is ultra-dry. Why were the relatively small piles of damp stuff not left to dry in the sun? Given the temperatures at AD they would be powder dry in a couple of months which would have been certainly quicker than the delivery of the wet screening plant. Only a small point, but is the sun not free?
 
watchlist Created with Sketch. Add SP8 (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $8.054M
Open High Low Value Volume
0.7¢ 0.7¢ 0.7¢ $5.534K 790.5K

Buyers (Bids)

No. Vol. Price($)
6 2561842 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 547547 4
View Market Depth
Last trade - 15.12pm 28/06/2024 (20 minute delay) ?
SP8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.