"Except Phase one and two were being built at the same time."
Another misleading statement.
Phase one construction was first and phase two followed. Every piece of phase two was built after the corresponding part of phase one. Hence the learning opportunities. They were "being built at the same time" but phase one construction was always well ahead of phase two construction.
- Forums
- ASX - By Stock
- Ann: Annual Report to shareholders
"Except Phase one and two were being built at the same time."...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.05 |
Change
-0.050(0.82%) |
Mkt cap ! $5.655B |
Open | High | Low | Value | Volume |
$6.03 | $6.08 | $6.03 | $11.79M | 1.949M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 44715 | $6.05 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.06 | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10052 | 6.050 |
1 | 8000 | 6.040 |
8 | 23705 | 6.030 |
6 | 45040 | 6.020 |
11 | 44867 | 6.010 |
Price($) | Vol. | No. |
---|---|---|
6.060 | 5000 | 1 |
6.070 | 14384 | 4 |
6.080 | 16172 | 4 |
6.090 | 11038 | 1 |
6.100 | 18095 | 6 |
Last trade - 16.10pm 22/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |