the progress at nifty
"In December 2017 the plant commenced production on a continuous basis after running on a campaign basis since acquisition. The mobile fleet was refurbished, new loaders were acquired and additional jumbo drill rigs were mobilized to site.
The underground conveyor system and underground crusher were refurbished. There were additional refurbishment and replacement projects undertaken at the camp, power plant and structural steel works on the processing plant.
During the period the ramp-up of mining rates and control of grade dilution were impacted by the predominance of production from within the historic ‘checkerboard’ mining area.
With additional resources being applied to site, changes in senior management and significant mine planning, the foundation is now strong for the production ramp-up over the remainder of 2018. Currently over 60% of development is outside the historic ‘checkerboard’."
- Forums
- ASX - By Stock
- Ann: Annual Report to shareholders
MLX
metals x limited
Add to My Watchlist
4.39%
!
54.5¢

the progress at nifty "In December 2017 the plant commenced...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
54.5¢ |
Change
-0.025(4.39%) |
Mkt cap ! $483.0M |
Open | High | Low | Value | Volume |
56.5¢ | 57.0¢ | 54.0¢ | $1.429M | 2.592M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 15737 | 54.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
55.0¢ | 4825 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 15737 | 0.545 |
10 | 191577 | 0.540 |
2 | 35868 | 0.535 |
8 | 145807 | 0.530 |
4 | 162809 | 0.525 |
Price($) | Vol. | No. |
---|---|---|
0.550 | 4825 | 2 |
0.555 | 135868 | 2 |
0.560 | 290868 | 2 |
0.565 | 18541 | 1 |
0.570 | 5891 | 2 |
Last trade - 16.10pm 30/06/2025 (20 minute delay) ? |
Featured News
MLX (ASX) Chart |