As I understand, there were 2 rigs on Rupice North and 1 rig fence-lining JB Zone.
Hole 7 was an infill hole whereas Hole 8 was drilling up and down dip along strike.
Two takeaways:
1. One rig is focused on stepping out along strike
2. Second rig is focused on infilling resource
Therefore:
1. Hole 9 and 10 were drilled simultaneously
2. Hole 9 is likely infill and thus not material
3. Hole 10 is likely the vertical hole drilled off the same pad as Hole 8 and is material because it extends strike down plunge.
- Forums
- ASX - By Stock
- Ann: Annual Report to shareholders
As I understand, there were 2 rigs on Rupice North and 1 rig...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
|
|||||
Last
$3.69 |
Change
-0.090(2.38%) |
Mkt cap ! $1.035B |
Open | High | Low | Value | Volume |
$3.75 | $3.76 | $3.66 | $2.290M | 619.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 3050 | $3.69 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.70 | 11281 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 7513 | 3.690 |
19 | 7694 | 3.680 |
16 | 15180 | 3.670 |
12 | 7211 | 3.660 |
11 | 54076 | 3.650 |
Price($) | Vol. | No. |
---|---|---|
3.700 | 5410 | 5 |
3.710 | 14099 | 16 |
3.720 | 34511 | 17 |
3.730 | 5458 | 8 |
3.740 | 4678 | 8 |
Last trade - 15.15pm 05/07/2024 (20 minute delay) ? |
Featured News
ADT (ASX) Chart |