There would also be consideration of wanting the TSF outflow dam near-empty at the beginning of the wet season. The large area of the TSF will collect a lot of rain, but the run-off will need to be contained, settled and possibly decontaminated before being released to the environment. Filling the tailings with process water drawn from the borefield will just make t harder to manage stormwater runoff later.
- Forums
- ASX - By Stock
- WKT
- Ann: Annual Report to shareholders
Ann: Annual Report to shareholders, page-248
-
- There are more pages in this discussion • 190 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable